House renovations in Birmingham
AV Builders & Roofing transforms homes across Birmingham and the West Midlands. From rewiring and replastering to full structural work, kitchen and bathroom fits, and media walls, we handle every part of a renovation with the same attention to detail and honest communication.
- Structural work and openings
- Rewiring and Part P compliance
- Plastering and decoration prep
When a renovation becomes essential
Some work is cosmetic. Some is essential. Here are the signs that point to a renovation now rather than patching over problems.
- Cracked plaster and blown ceilings spreading across roomsOne small crack is cosmetic. Widespread damage to ceilings and plaster often means rising damp, condensation or structural movement underneath.
- Electrics that trip, outlets that don't work, or sockets feeling warmOld wiring can't handle modern appliances and poses a real fire risk. A rewire brings everything up to current Building Regulations.
- Water stains on walls or ceilings after rainLeaks only get worse. The longer you leave them, the more timber and plaster damage occurs behind the scenes.
- Visible damp, mould or a musty smell that doesn't shiftDamp weakens plaster and timber and indicates ventilation, drainage or structural issues that need proper diagnosis.
- Cracked or uneven walls, or doors that won't close properlyThese can be signs of subsidence, foundation movement or structural problems that need a surveyor's view.
- Kitchens or bathrooms that are worn out but still workThese are purely cosmetic. Plan them in with a bigger renovation to get a better price and cleaner finishes.
Not sure what you're looking at? Send us photos on WhatsApp and we'll talk through what matters and what can wait.

How a renovation is done properly
A good renovation follows a sequence. Work out of order leaves you fixing problems twice over.
Survey and planning
We look at the structure, electrics, plumbing and ventilation, and talk through what needs doing now and what can be cosmetic later. You get a written plan and a quote that breaks down each part.
Securing and protection
We set up site safety, protect existing fixtures and finishes, and plan where materials will go and how the household works around the work.
Structural and opening work first
Any walls that come down, openings that are made, or structural repairs are done before anything else. This is where lintel sizes, structural engineers' approval and Building Regs sign-off matter.
Rewiring and first-fix plumbing
Cables and pipes go in after structural work is complete. This includes testing to Building Regulations and ensuring every circuit is properly earthed and sized.
Plastering and skimming
Once the building work is done, walls are made good, skimmed or re-plastered, and prepared properly for decoration.
Kitchens, bathrooms and fitted furniture
Once the shell is ready, appliances, suites and joinery are fitted. Second-fix plumbing and electrics are connected and tested.
Decoration and final touches
Painting, flooring, lighting and tidy-up happen last. Final checks and a walk-round with you close out the job.
Regulations and approvals that apply
House renovation work is governed to protect the building and the people in it. Here is what usually matters.
Building Regulations
Most renovation work needs Building Control approval. That covers structural work, insulation, ventilation, electrics, plumbing, stairs, windows and fire safety. AV Builders & Roofing handles all the notifications and inspections with the council.
Part P — Electrical work
Any rewiring or new circuits must comply with BS 7671 and Part P of Building Regulations. We're qualified and registered for this work, and you'll get a certificate on completion.
Structural work and engineers
If you're removing walls or making large openings, a structural engineer's design and a Council inspector's sign-off are needed. We arrange both and work to their specifications.
Party Wall Act
If your house is semi or terraced and you're doing certain structural work, the Act requires notice to your neighbour. We'll advise if it applies to your project.
Planning permission
Most internal renovations don't need planning. Extensions, new windows or changes to the external appearance might. We'll check with the council before you're committed to anything.
The scope of renovation work we handle
Renovation can mean many things. Here are the jobs we regularly take on, and what each one typically includes.
Structural and opening work
Removing walls, creating openings for arches or bi-fold doors, or strengthening existing structures. Includes engineer's design and Building Control approval.
Rewiring and electrics
Full rewire or selective circuit additions. We test to BS 7671, fit modern earthing and protection, and issue an EICR certificate on completion.
Plastering and skimming
Plasterboard, bonding and finish coats to prepare walls and ceilings for decoration after structural work.
Plumbing and heating updates
New pipes, new radiators, boiler changes and bathroom or kitchen plumbing. All notified to Building Control where required.
Kitchens and bathrooms
Supply and fit of units, appliances, suites and tiling. We arrange the electrics and plumbing connections, or coordinate with other trades.
Decoration and finishing
Painting, wallpaper, flooring and final details. Done last so it's not damaged by earlier trades.
What a renovation quote should include
- Site survey and planning meeting
- Building Control notifications and inspections
- Structural engineer's fees (if needed)
- All labour for the trades involved
- Materials — clearly listed with grades and quantities
- Electrical testing and certification
- Plumbing pressure testing and flushing
- Removal and disposal of old materials
- Temporary protection and site tidiness
- Final inspection and snag list resolution
- Paperwork — quotes, invoices, certificates and approvals
What moves the cost of a renovation
No two renovations are the same price. These factors have the biggest impact.
- Scope and complexity. A fresh plaster and rewire costs far less than a full structural overhaul with a new kitchen.
- Materials and finishes. Budget kitchens and bathrooms versus premium brands make a real difference.
- Hidden damage. Once you open walls you sometimes find rotten timber, failed insulation or old plumbing that needs replacing.
- Building Regulations. Structural work, engineers and multiple inspections add cost but are non-negotiable.
- Timing and access. Working around occupied homes or tight spaces takes longer and needs careful planning.
- Coordination. Jobs that have trades waiting on each other run longer. Phasing work smartly saves time and money.
Living through a renovation
These habits make a job safer and faster for everyone.
- Keep clear pathways. Hallways, stairs and exits need to be passable for emergency and efficient working.
- Protect your belongings. We cover furniture and fixtures, but moving valuable items and art helps avoid accidental damage.
- Plan utilities carefully. If you lose water or electrics, we'll tell you when. Arrange alternative arrangements if needed.
- Confirm changes in writing. If something changes during the work, agree it and log it so invoicing is clear.
- Inspect as work progresses. We'll show you first-fix plumbing and electrics before they're covered. Walk through and spot issues early.
- Keep records and photos. Hold on to invoices, certificates and photos for future reference, insurance and when you sell.
Deep did an amazing job on our house — we did a rewire upstairs with new spotlights and lighting, a few walls needed skimming and plastering, and he also helped create a mini media wall in our bedroom. Quality of work is brilliant, punctual, on time and kept me informed always.
Homeowner review, full renovation
House renovation questions, answered
Do we need Building Regulations approval for our renovation?
Most renovation work does. Structural changes, electrics, plumbing, windows and insulation all typically need Building Control notification and inspection. AV Builders & Roofing handles all the paperwork and inspections — you just need to plan the extra 2–3 weeks for sign-offs. Work done without approval can cause problems when you sell or when your insurer looks at a claim.
How long does a typical house renovation take?
It depends entirely on scope. A single-room rewire and plaster might be 2–3 weeks. A full house renovation with new kitchen, bathroom, electrics and structural work is typically 8–12 weeks plus any Building Regulations inspection delays. We'll give you a realistic timeline broken down by phase before work starts.
What if we find damp or rotten timber during the work?
We inspect as we open walls and will tell you immediately if we spot problems. Any extra work (timber replacement, treatment, damp-proofing) is agreed with you in writing before we do it. The price adjusts for genuine hidden issues — we don't discover them twice.
Can we live in the house while renovation is happening?
Yes, though it depends on the scale of work. Structural demolition, electrics being rewired, and plumbing disruption are all disruptive. We'll help you plan temporary arrangements — asking you to stay with family for certain phases, or arranging work so you have water and electrics in key areas. Full transparency on this at the quote stage.
Do you arrange Building Control inspections, or do we?
We arrange them. We submit the notification to the council, book inspections at the right stages (foundation, first-fix, final), and liaise with the inspector throughout. You get a Completion Certificate at the end, which you'll need if you sell or extend later.
What happens if the quote changes during the work?
Any changes are discussed with you as soon as we know about them. If hidden issues arise or you request extra work, we write down the adjustment, the reason, and the cost before we proceed. You approve it in writing. No surprises on the final invoice.
Where we do renovations
We carry out house renovations across Birmingham and the surrounding areas. Here are the nearest districts.
Also covering Selly Oak, Sutton Coldfield, Solihull, Smethwick and West Bromwich. See every area we cover.
Get a quote for your house renovation
Describe what you're doing and send photos of the spaces. We'll come back with a written plan and quote that breaks down each part.